  1. 01

    Declaration is mandatory: in Saudi government tenders, bidders must declare a targeted local content percentage with the technical offer.

  2. 02

    No minimum does not mean no impact: if no threshold is stated, low local content may still weaken your ranking during evaluation.

  3. 03

    Scoring usually favors LC heavily: many tenders use a 60/40 split between price and local content factors, with possible listed-company bonus points.

  4. 04

    Delivery is audited after award: winning bidders are expected to submit implementation plans and periodic evidence of actual local content delivery.

What local content means in practice

Local content in Saudi procurement refers to how much of contract value is retained inside the Kingdom through Saudi goods, services, workforce, and technology transfer. It is a core policy instrument aligned with Vision 2030 and is regulated through the Local Content and Government Procurement Authority framework.

These rules apply across public procurement and now also extend into many state-owned entities where the state ownership threshold is met. For bidders, local content is no longer a side compliance topic; it is a core competitiveness variable.

Core rules for public tenders

  1. Declare your target LC: state the local content percentage you commit to deliver by contract completion.
  2. Meet any stated minimum: if the tender specifies a threshold, offers below it are commonly disqualified during technical evaluation.
  3. Report actual delivery: after award, local content execution is tracked through plans, periodic reports, and potential third-party audit.

When the tender does not specify a minimum local content requirement

This is a common bidder question. In most cases, you still submit a local content target in your bid. You may not be automatically disqualified for a lower percentage if no minimum is published, but your declared commitment is usually still scored. In other words: no threshold does not mean no consequence.

Practically, this creates a strategic choice. Teams that localize supplier mix early often score better and also de-risk execution during post-award monitoring.

Sector and contract mechanics to track

Typical mechanism map (illustrative)
Mechanism What to expect Bidder impact
Minimum LC thresholds Sector/project specific ranges, often stricter in strategic sectors Low declared LC can fail technical gates where minimums are mandatory
High-value contracts Enhanced oversight for larger contracts (commonly SAR 25M+ or SAR 50M+ by framework) Expect stronger planning, reporting, and audit rigor
National product preference Foreign product prices may be adjusted upward in evaluation Local sourcing can improve competitiveness beyond LC score itself
Listed-company bonus Certain tenders include extra points in LC scoring May improve ranking margin in close competitions

Joint ventures: how local content is assessed

Joint ventures are commonly used by foreign and Saudi firms to combine capabilities in public projects. For tender evaluation, the JV is typically treated as a single bidding entity for local content purposes.

  • Single declaration: the JV submits one targeted local content commitment with its bid.
  • Local partner leverage: Saudi partner supply chain and workforce access often improve achievable LC performance.
  • Post-award accountability: JV delivery is monitored and can be audited, including subcontractor contribution evidence.
Saudi market development and infrastructure visual
JV and delivery planning benefit from localized supply networks and infrastructure depth.

Practical checklist for bid teams

  1. Build a local content baseline from your current supplier and labor mix before bid drafting.
  2. Model at least three target LC options and pressure-test deliverability before committing.
  3. Where relevant, structure JV/subcontractor plans to increase verified Saudi value contribution.
  4. Prepare documentary evidence pathways in advance (invoices, subcontract logs, payroll and sourcing records).
  5. Within 60 days of award, align the local content implementation plan with contract milestones.
  6. Track monthly actuals against commitment and correct gaps early to avoid end-of-contract non-compliance risk.

Bottom line

Saudi local content policy is now a strategic procurement variable, not just a compliance appendix. Bidders that design their local supply chain, workforce, and partnership model early will generally be more competitive at award and more resilient during delivery.

This page is a strategic briefing and not legal, financial, or professional advice. Teams should validate tender-specific requirements and current regulations before submission.